Click on pictures for enlarged view.
Notates new profile

"The Brotherhood" Studio

Lights, Camera, Action! K-13 Light Grey will provide the acoustical control in this new TV studio in East Providence Rhode Island. The new site of the Showtime hit series, "The Brotherhood", chose 1.5", Noise Reduction Coefficient of 1.05, applied to all ceilings and selected walls to reduce reverberation. The project was completed in seven days so construction of sets and filming could begin on time.

 

 Project Architect  Details

"The Brotherhood" Studio
862 Waterman Avenue
East Providence, RI

Blind Decker Productions
862 Waterman Avenue
East Providence, RI

K-13 Light Grey
25,200 Square Feet
1.5" Thickness

 


Brown Shipping

Vinyl backed fiberglass batts certainly are the most economical solution to insulating a metal building, but it clearly is not the best long term solution. This 40,000 square foot renovation included the removal of the original insulation and replacement with K-13 Spray-On Thermal Insulation. Applied at a 2" monolithic coating, the K-13 is providing an R-Value of 9.4 along with a Noise Reduction Coefficient of 1.05. The removal of wet ripped and sagging fiberglass insulation is not a novel one, A.T.I. performs the cut and replace application several times per year.

 Project Architect  Details

Brown Shipping
40 Hayes Memorial Blvd.
Marlboro, MA

The Bottom Line Exchange
10 Turnpike Road
Southborough, MA

K-13 Light Gray
40,000 Square Feet
2" Thickness

 


Cork Technologies

RISE Engineering of Cranston Rhode Island taps K-13 for this recent mill renovation in Lawrence Massachusetts. Utilizing the local utility company's refund program, this application of 2.76", R-Value of 13, qualified for the payback program. At a fraction of the cost of re roofing a structure of this age, K-13 Beige is providing thermal protection along with a textured finish ceiling for the future open air office space.

 

 Project Architect  Details

Cork Technologies
19 South Canal Street
Lawrence, MA

RISE Engineering
1341 Elmwood Avenue
Cranston, RI

K-13 Beige
6,550 Square Feet
2.76" Thickness

 


Gibson Dog Kennel

This state of the art dog kennel in Grafton Massachusetts is one of several recently completed with K-13 to lower reverberation times. With the recent data suggesting that the acoustical performance of the kennels contribute to nervousness and sickness among pets more attention is being put into the performance of the space. The application of the K-13 reduced noise levels to an acceptable level providing comfort to customers and overnight guests.

 

 Project Owner  Details

Gibson Dog Kennel
139 Upton Street
Grafton, MA

Gibson Dog Kennel
139 Upton Street
Grafton, MA

K-13 Light Gray
3,600 Square Feet
1" Thickness

 


New Bedford Waste Water Treatment Plant

This below grade sewerage treatment plant in New Bedford Massachusetts received a 3" application of White K-13 for thermal protection back in 1995. A recent visit to the site revealed the K-13 performing remarkably under a multitude of various conditions. From digester rooms to mechanical areas, the K-13 will keep this working environment warm and much quieter for years to come.

 

 Project Architect  Details

N.B. Waste Water Treatment Plant
1000 Rodney French Road
New Bedford, MA

Camp Dresser & McKee
10 Cambridge Center
Cambridge, MA

K-13 White
30,000 Square Feet
3" Thickness

 


Ty-Wood Corporation

Take out the earplugs and listen to what Ty-Wood Corporation of Holliston Massachusetts did to reduce reverberation time in their press room. 1.5" of White K-13 was applied to the ribbed metal deck and perimeter walls to achieve a Noise Reduction Coefficient of 1.05. This application was retrofitted with all the computerized machinery in place and performed on a 3rd shift schedule without any loss of production in the plant.

 

 Project  Architect  Details

Ty-Wood Corporation
79 Lowland Street
Holliston, MA

John Kuhlman
79 Lowland Street
Holliston, MA

K-13
30,000 Square Feet
1.5" Thickness

Top of page